丁香婷婷再一新_无码不卡午夜在线_巨胸喷奶水www久久久免费观看_337p日本大胆欧美人术艺术69影院_国日韩产超清无码 片内射_热99精品视频只有这里有精品82_日韩国产亚洲欧美不卡观看_国产成年综合免费观看_波多野结衣高潮视频_亚洲综合五月天激动情网

Ujite Environmental Protection Center

11.05.2024 10:05
Visits:256

Ujite Environmental Protection Center

Headquarters Building
  • Project location

    Hangzhou, Zhejiang

  • Development organization

    Ujite Environmental Protection Technology Co., Ltd

  • Architectural design

    Shanghai Tianhua Architectural Design Co., Ltd



The Hangzhou Ujite Special Environmental Protection Center is located in Xiaoshan District, a key location in the commercial circle, with a superior geographical location and convenient transportation. The office building is surrounded by sound infrastructure such as financial enterprises, high-end restaurants, and entertainment. This project is a typical modern style decoration, showcasing classic business qualities of simplicity and fashion everywhere.

▲ Project Realistic Map


As the headquarters building of Ujite Company, its exterior design is particularly important. This project adopts a curtain wall method that combines glass curtain wall and window wall. The architect is based on low energy consumption, low pollution, and low emissions, and highlights the lightweight architectural form and design concept through large decorative lines on the exterior, showcasing the comfort, beauty, and atmosphere of the new era headquarters building.


This project adopts different curtain wall systems in the main building and podium of different elevations. The specific application diagram can be seen by sliding in the following figure for more introduction to curtain wall systems.


▲ Slide left and right to view different facade curtain wall systems




01



Innovative application section


In order to meet the requirements of facade effect and ensure the quality of its results, it is necessary to focus more on improving production efficiency and cost control in facade design. The following content will introduce the innovative application highlights in facade design from the aspects of glass cantilever wings, window wall systems, roof waterproofing methods, etc.


A

Glass cantilever wings


The surrounding glass wings are a major highlight of this project. To achieve the effect of glass wings overhanging in poor structural conditions, it is not only necessary to achieve the building facade effect, but also to meet the structural stress requirements. The force is applied on the steel columns measured internally, and three larger steel columns and steel beams are used to achieve the effect of external wing overhang.


The large-area Low-E glass curtain wall organically integrates factors such as architectural aesthetics, functionality, energy efficiency, and structure, allowing the Ujite Environmental Protection Center to present different color tones from different perspectives and dynamic beauty with changes in sunlight, moonlight, and lighting.



Due to the pure cantilever method of the glass wing, it cannot be directly fixed to the structure. To meet the calculation requirements, the glass wing column is fixed on the side column, and the specifications of the adjacent three columns are appropriately expanded according to the calculation value.


The specification of the flying wing column is 180x100x6 hot-dip galvanized steel pipe, which is connected to three 200x150x8 galvanized steel square joints by 180x100x6 hot-dip galvanized steel pipe crossbeam connectors.


▲ Node diagram

B

Roof waterproof 


The roof waterproofing adopts three waterproofing processes: sealant, galvanized steel plate, and batch watered steel plate.


The specific steps are:


1.The top pillar, decorative aluminum plate, and roof sealing aluminum plate are sealed with sealant and flange cover, which is the first waterproof sealing.


2.The column is disconnected, and the top column is connected by a plug. The roof aluminum plate is fixed with the plug by gluing, which is the second waterproof sealing.


3. The roof sealing aluminum plate is made with a waterproof board inside, which serves as the third layer of waterproof sealing.


In order to maximize the protection of buildings and structures, these three measures can effectively delay the aging of waterproof materials. Extend the durability of the waterproof layer; And to a certain extent, it can reduce the structural deformation caused by roof temperature and temperature difference.


節(jié)點圖


C

Window wall system


▲ Node diagram


In addition, this project adopts an aluminum alloy window wall system to achieve the effect of imitating a curtain wall on the exterior facade, ensuring the continuous effect of the glass facade.


Compared with traditional modular systems, the application of window and wall systems can leave the vast majority of processes in the processing plant, avoiding the difficulties of on-site construction quality control and high installation costs, improving construction quality, and shortening construction periods.




02



On site construction phase


As a building envelope structure, the exterior wall not only needs to have a beautiful appearance, but also needs to have certain functions such as waterproofing, insulation, and fire prevention. In the construction industry, exterior wall engineering management plays a crucial role.


Forcitis always focuses on the integration of engineering quality, progress, and implementation effectiveness. During the construction phase, we focus on leakage hazards, safety risks, complaint issues, and inspection checklists.


The problem encountered in the quality management of the project site is that the roof waterproofing method was not constructed according to the drawings, resulting in significant water leakage hazards.


▲ Unqualified performance points


Solution: After communicating with the construction party, the construction party installed stainless steel water blocking channels around the pillars at the roof junction position, and made galvanized steel sheet water covering plates and aluminum sheet cover plates according to the drawing requirements.


▲ Pictures after on-site resolution


In addition, due to the large number of project systems and complex exterior design, a lot of effort was also spent on researching methods during the design process. After the project drawings were completed, the owner also invited experts to conduct internal review of the drawings and strengthened the waterproofing and other positions.



From the surrounding area of the project to the exterior and interior design details, the Ujite Environmental Protection Center integrates with nature, creating an ecological green production environment that can meet the diverse office needs of contemporary young people. It is a rare high-quality office space. It is also a symbol of the maturity and quality of urban regional commerce, and one of the labels that showcase the economic strength and vitality of cities and enterprises.


Share to